Construction Invoice Template
Built for contractors billing labor, materials and change orders — with a project line, a retainage line and an approval signature. Free in PDF, Word or Excel.
File format
INVOICE
#INV-2026-014
Date
Sep 23, 2026
Due date
Oct 23, 2026
Terms
Net 30
From
Ridge Line Builders
Sacramento, CA
Bill To
M. Alvarez
Davis, CA
Sample preview — not your real data
Modern
Invoice
#INV-2026-014
From
Ridge Line Builders
Sacramento, CA
Bill To
M. Alvarez
Davis, CA
Sample preview — not your real data
Classic
Invoice
#INV-2026-014
From
Ridge Line Builders
Bill To
M. Alvarez
Sample preview — not your real data
Minimal
Each downloads a blank PDF template — no data required.
Want one prefilled with your own details instead? Use the generator, or browse all free invoice templates.
What to include on a construction invoice
- Your business details and contractor license number, where your state requires one.
- The client, the project name and the job site address.
- An invoice number, the date, and the phase or progress payment number it covers.
- Labor and materials on separate lines — plus equipment rental, permits and disposal fees.
- Each approved change order on its own line, with its number.
- Retainage withheld as a deduction line, then the amount due for this invoice.
- Payment terms, and a signature line for the client's approval.
The template has a line for each of these. If the invoice covers one phase of a larger project, say which phase so the client isn't left guessing what the number corresponds to.
Construction invoice example
A progress invoice for the framing phase of a home addition, with an approved change order and 10% retainage:
| Labor — framing crew, 40 hours × $65 | $2,600.00 |
| Lumber & materials | $1,850.00 |
| Change order #2 — added window, approved Sept 18 | $420.00 |
| Subtotal for this phase | $4,870.00 |
| Less retainage — 10% withheld | −$487.00 |
| Amount due | $4,383.00 |
In the Excel version, type the retainage as a negative amount and the totals recalculate. The retained $487 is billed later, once the project is substantially complete or passes final inspection, as the contract says.
Progress billing and retainage
Few construction jobs get billed in a single invoice. Most use progress billing — invoicing at defined milestones (materials delivered, framing complete, rough-in passed inspection) rather than waiting until the entire project wraps. It keeps cash flowing during a job that might run weeks or months. See payment terms explained for how milestone-based terms compare to a flat Net 30.
Many construction contracts also include retainage — a percentage of each progress payment, commonly 5-10%, that the client withholds until the project is substantially complete or passes final inspection. List it as its own deduction line, as in the example above, rather than just showing a smaller total, so the client can see exactly how much is held back and why.
When a client asks for an AIA G702
On larger commercial projects, the contract may call for a pay application instead of a plain invoice: AIA G702, Application and Certificate for Payment, with a G703 Continuation Sheet. The G703 breaks the contract sum down into a schedule of values; the G702 summarizes the contract sum, approved change orders, work completed and stored, retainage and previous payments, and the architect certifies the amount due (AIA Contract Documents — G702 and G703 pay applications). These are AIA's own forms, sold through AIA Contract Documents — not something a free template replaces. For residential and smaller jobs, an itemized invoice like this one is the norm.
Common construction invoicing mistakes
- Billing a change order nobody signed — get written approval before the extra work, then bill it on its own line with its number.
- Hiding retainage in the total — the client can't reconcile it, and you lose track of what's still owed to you.
- No project or phase reference — the owner pays several invoices and can't tell which phase this one covers.
- Materials with no backup — keep supplier receipts; larger clients often ask for them.
- Letting lien deadlines pass — if a client stops paying, the clock to protect yourself is short (see below).
What happens if a client doesn't pay
Construction has a legal tool most other industries don't: the mechanics lien, a claim against the property itself that can block the owner from selling or refinancing until an unpaid contractor is paid. In California, a direct contractor must record a claim of lien within 90 days after completion of the work, or 60 days after the owner records a notice of completion or cessation — whichever comes first (California Civil Code §8412). Miss that window and the right to file is generally lost. Every state sets its own deadlines and notice requirements, so check your own state's statute — it's a serious step, not a routine part of invoicing, and most late payments are resolved with a clear reminder long before it's relevant.
Related templates and tools
Invoicing as an individual contractor rather than a construction company? See the contractor invoice template for W-9 and 1099 specifics. Still quoting the job rather than billing for it? Use the estimate generator — already sourced on California and New York's written-contract thresholds for home improvement work.
Frequently asked questions
Beyond the standard fields (invoice number, dates, your details, your client's), a construction invoice needs the project and job site, labor and materials broken out separately, equipment and permit costs, approved change orders, any retainage withheld, and the phase or milestone the invoice covers.